Russian-Ships.info

Main Page
+ Russian Navy 2014
+ Russian Coast Guard 2014
Search
Download!
Links
Russian version
About
Feedback
 
 
 
   
   
   
 
 
   
 

Large submarines
Project 877 Paltus
Project 877V
Project 877E
Project 877EKM
Project 08773

Project 636
Project 636M

NATO: Kilo Ñlass


Quantity

59 + 12 units


Ships

Project 877 – 22+4 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Shipyard named after Leninskogo komsomola, Komsomolsk-on-Amur – 15+2 units
B-248
¹451
16.03.1980
12.09.1980
31.12.1980
laid down as Project 877E
B-260
¹452
22.02.1981
23.08.1981
30.12.1981
laid down as Project 877E, from 19.03.2006 - B-260 Chita
B-227
¹453
23.02.1982
16.09.1982
23.02.1983
laid down as Project 877E, from 07.2008 - B-227 Vyborg
B-229
¹464
23.02.1983
15.07.1983
30.10.1983
 
B-404
¹465
7.05.1983
24.09.1983
30.12.1983
 
B-405
¹466
20.04.1984
21.09.1984
30.12.1984
from 24.07.1990 - B-405 Tyumensky komsomolets, from 15.02.1992 - B-405
B-470
¹467
6.05.1985
27.08.1985
30.12.1985
 
B-439
¹468
4.04.1986
31.07.1986
30.12.1986
 
B-445
¹469
21.03.1987
26.09.1987
30.01.1988
from 2007 - B-445 Svyatitel` Nikolay Chudotvorets
B-394
¹470
15.04.1988
3.09.1988
30.12.1988
from 30.12.1987 - B-394 Komsomolets Tadzhikistana, from 15.02.1992 - B-394
B-464
¹471
26.05.1989
23.09.1989
30.01.1990
from 27.11.2003 - B-464 Ust`-Kamchatsk
B-494
¹472
5.05.1990
4.10.1990
30.12.1990
from 27.11.2003 - B-494 Ust`-Bol`sheretck
B-187
¹473
7.05.1991
5.10.1991
30.12.1991
 
B-190
¹474
8.05.1992
25.09.1992
30.12.1992
from 11.12.2007 - B-190 Krasnokamensk
B-345
¹475
22.04.1993
6.10.1993
22.01.1994
from 2009 - B-345 Mogocha
B-
-
-
-
-
not completed
B-
-
-
-
-
not completed
Krasnoe Sormovo Shipyard, Gorky - 7+2 units
B-401
¹601
6.10.1982
5.03.1984
30.09.1984
from 18.07.1998 - B-401 Novosibirsk
B-402
¹602
24.08.1983
23.09.1984
30.12.1984
from 3.03.1997 - B-402 Vologda
B-808
¹605
29.09.1986
30.07.1988
27.12.1988
from 16.09.1999 - B-808 Yaroslavl`
B-800
¹606
5.03.1987
7.05.1989
30.09.1989
from 24.07.1990 - B-800 Vologodsky komsomolets, from 15.02.1992 - B-800, from 31.05.2003 - B-800 Kaluga
B-459
¹608
25.02.1988
29.04.1990
28.09.1990
from 2.08.1997 - B-459 Vladikavkaz
B-471
¹609
26.10.1988
22.09.1990
28.12.1990
from 06.2001 - B-471 Magnitogorsk
B-177
¹610
3.11.1989
27.07.1991
26.12.1991
from 12.2000 - B-177 Lipetck
B-
¹612
-
-
-
on scrap 1994
B-
¹613
-
-
-
on scrap 1994

Project 877V – Krasnoe Sormovo Shipyard, Gorky – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-871
¹607
17.05.1988
10.09.1989
30.11.1990
from 5.01.2004 - B-871 Alrosa, pump jet propulsion

Project 877E – Krasnoe Sormovo Shipyard, Gorky – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-351
¹603
29.09.1984
7.06.1985
29.11.1985
laid down as Project 877

Project 877EKM – 18 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Krasnoe Sormovo Shipyard, Gorky (from 1992 Krasnoe Sormovo Shipyard, Nizhny Novgorod) - 8 units
B-801
¹401
6.04.1984
20.09.1985
29.09.1985
 
B-806
¹403
15.10.1984
30.04.1986
25.09.1986
then - B-806 Dmitrov
B-861
¹404
14.02.1985
26.07.1986
29.11.1986
 
B-890
¹405
19.06.1985
18.04.1987
2.09.1987
 
B-386
¹411
26.07.1986
10.07.1987
5.11.1987
 
B-803
¹412
15.05.1986
15.04.1988
15.08.1988
 
B-185
¹413
23.03.1989
31.05.1994
15.11.1994
 
B-188
¹414
18.11.1990
31.03.1995
15.08.1995
 
Leningradskoe Admiralteyskoe ob`edinenie, Leningrad (from 1992 Admiralteiskie Verfi, Sankt-Peterburg) – 10 units
B-888
¹01307
29.05.1983
29.07.1985
25.11.1985
 
B-898
¹01309
1.04.1986
27.07.1986
25.11.1986
 
B-860
¹01311
15.05.1987
13.09.1987
25.12.1987
 
B-804
¹01313
20.04.1988
16.08.1988
29.11.1988
 
B-468
¹01315
5.04.1989
26.08.1989
30.10.1989
 
B-597
¹01317
6.04.1990
27.07.1990
27.10.1990
 
B-175
¹01319
5.04.1991
25.09.1991
25.12.1991
 
B-224
¹01321
30.04.1992
16.10.1992
31.12.1992
 
B-220
¹01323
5.02.1992
12.07.1994
2.09.1996
 
B-582
¹01325
16.02.1995
26.06.1997
2.10.1997
 

Project 08773 – Admiralteiskie Verfi, Sankt-Peterburg – 1 unit

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-477
¹01618
12.12.1998
14.10.1999
16.05.2000
 

Project 636 – Admiralteiskie Verfi, Sankt-Peterburg – 2 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-
¹01616
16.06.1996
26.04.1997
26.08.1997
 
B-
¹01327
28.08.1997
18.06.1998
25.10.1998
 

Project 636M – 8 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
Admiralteiskie Verfi, Sankt-Peterburg – 5 units
B-
¹01329
19.10.2002
27.05.2004
10.12.2004
 
B-
¹01330
19.10.2002
19.08.2004
30.04.2005
 
B-
¹01331
7.03.2003
24.02.2005
15.06.2005
 
B-
¹01332
11.08.2003
26.05.2005
14.09.2005
 
B-
¹01333
7.05.2003
26.08.2005
30.05.2006
 
Krasnoe Sormovo Shipyard, Nizhny Novgorod - 1 unit
B-340
¹611
07.1992
8.05.2004
8.08.2005
laid down as Project 877
JSCo «PO «Sevmash», Severodvinsk - 2 units
B-
¹701
29.05.2003
4.06.2005
17.11.2005
 
B-
¹702
29.05.2003
17.07.2005
24.11.2005
 

Project 06361 – Admiralteiskie Verfi, Sankt-Peterburg – 5+3 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-
¹01336
29.04.2007
20.11.2008
28.08.2009
 
B-
¹01337
27.12.2007
9.04.2009
29.10.2009
 
B-
¹01339
24.08.2010
28.08.2012
2013
 
B-
¹01340
28.09.2011
28.12.2012
28.06.2013
 
B-
¹01341
28.03.2012
28.08.2013
14.03.2014
 
B-
¹01342
23.10.2012
28.03.2014
plan 2014
under construction
B-
¹01343
1.07.2013
plan 12.2014
-
under construction
B-
¹01344
28.05.2014
-
-
under construction

Project 06363 – Admiralteiskie Verfi, Sankt-Peterburg – 1+5 units

Name
Yard ¹
Laid Down
Launched
Commissioned
Note
B-261 Novorossiysk
¹01670
20.08.2010
28.11.2013
21.08.2014
 
B-237 Rostov-on-Don
¹01671
21.11.2011
26.06.2014
plan 2014
under construction
B-262 Staryy Oskol
¹01672
17.08.2012
28.08.2014
plan 11.2014
under construction
B-265 Krasnodar
¹01673
20.02.2014
-
-
under construction
B-268 Velikiy Novgorod
¹01674
plan 10.2014
-
-
under construction
Kolpino
¹01675
plan 10.2014
-
-
under construction



General characteristics - Project 877

Displacement (tons):
Surfaced:2325
Submerged:3075
Dimensions (m):
Length:72,6
Beam:9,9
Draught:6,6
Speed (knots):
Surfaced:10,7
Submerged: 18
Range:
Surfaced: 
Under snorkel:6880 nmi (7 knots)
Submerged:400 nmi (3 knots)
Diving depth (m):
Operational:240
Maximum:300
Endurance (days):45
Propulsion:1x5800 hp PG-141M electric motor, 1x150 hp PG-142 electric motor, 1 fixed pitch propeller (Project 877V – 1 pump-jet), 2x1500 kW 4DL-42M diesel-generators (on earlier submarines - 2 x1000 kW)
Armament:

8õ1 SAM system 9K310 «Igla-1» launchers (9M313 missiles) – not on Project 08773
6 533 mm bow torpedo tubes - 18 torpedoes (53-65K, 53-56B, 53-56BA, SET-53M, TEST-71M, USET-80 (Project 877EKM – 53-65KE, TEST-71ME, Project 08773, 636M – torpedoes 53-65KE, TEST-71ME, anti-ship guided missiles 3M-54E)) or 24 DM-1 mines

Electronics:

MRK-50 «Kaskad» Radar complex (Project 877EKM – MRK-50E «Kaskad»), MRP-25 reconnaissance radar (Project 877EKM – MRP-25E), «Khrom» IFF, MGK-400 «Rubikon» sonar complex (Project 877EKM – MGK-400E «Rubikon»), MG-519 «Arfa» mine detection sonar , MG-512 «Vint» self-cavitation measurement sonar, MG-53 noise detection sonar, MG-553 «Shkert», MGS-30, MVU-110 «Uzel» combat information control system, «Andoga» navigational complex

Crew:60 (16 officers)

General characteristics - Project 636

Displacement (tons):
Surfaced:2350
Submerged:3100
Dimensions (m):
Length:73,8
Beam:9,9
Draught:6,6
Speed (knots):
Surfaced:12
Submerged: 19,8
Range:
Surfaced: 
Under snorkel:7500 nmi (7 knots)
Submerged:400 nmi (3 knots)
Diving depth (m):
Operational:240
Maximum:300
Endurance (days):45
Propulsion:1x5800 hp PG-141M electric motor, 1x150 hp PG-142 electric motor, 1 fixed pitch propeller, 2x1500 kW 4DL-42M diesel-generators
Armament:

8õ1 launchers SAM system 9K310 «Igla-1» (missiles 9M313)
6 533 mm bow torpedo tubes - 18 torpedoes 53-65K, 53-56B, 53-56BA, SET-53M, TEST-71M, USET-80 (Project 636M, 06361 – torpedoes 53-65KE, TEST-71ME, Missile complex «Club-S» (anti-ship missiles 3M-54E), Project 06363 – missile complex «Kalibr-PL») or 24 DM-1 mines

Electronics:

MRK-50 «Kaskad» Radar complex, MRP-25 ESM Radar system, «Khrom-M» IFF, MGK-400 «Rubikon» sonar complex ¹01339-01344 – MGK-400V1 «Rubikon»), MG-519 «Arfa» mine detection sonar, MG-512 «Vint» self-cavitation measurement sonar, MG-53 noise detection sonar, MG-553 «Shkert», MVU-110EM «Uzel» combat information control system, «Andoga» navigational complex

Crew:60 (16 officers)

Schematics

Large submarine - Project 877
Large submarine - Project 877


Modernizations

On B-187in 2010, on B-800 in 2002-9.07.2013 MGK-400 «Rubikon» sonar complex replaced by MGK-400V1 «Rubikon», MVU-110 «Uzel» combat information control system replaced by MVU-110EM «Uzel», «Andoga» navigational complex replaced by «Andoga-M»
Non-realized updatings of the project: Project 877B; Project 877EK – export variant


Fleets

Baltic Fleet: B-175, 188, 220, 224, 340, 351, 386, 468, 477, 582, 597, 803, 804, 806, 860, 861, 888, 890, 898, ¹01327, 01329-01333, 01336, 01337, 01339-01344, 01616
Black Sea Fleet: B-177 (from 1991 Nothern Fleet), 261 Novorossiysk, 459 (from 1991 Northern Fleet), 471 (from 1991 Northern Fleet), 800 (from 1991 Northern Fleet), 801, 871
Northern Fleet: B-185, 401, 402, 808, ¹701, 702
Pacific Fleet: B-187, 190, 227 (ñ 14.02.1986 Baltic Fleet), 229, 248, 260, 345, 394, 404, 405, 439, 445, 464, 470, 494


Hull Numbers

B-177: 599(1991), 429(2002)
B-187: 529(1997)
B-190: 521(2000)
B-227: 469(1998)
B-229: 500(2000)
B-248: 536(2000)
B-260: 504(2000)
B-261 Novorossiysk: 468(2014)
B-345: 507(2000)
B-394: 522(2000)
B-401: 440, 400(1991), 403(2000)
B-402: 418(1991), 462(2000)
B-404: 524(2000)
B-405: 535(2000)
B-439: 545(2000)
B-445: 531(2000)
B-459: 593(1990), 431(1994)
B-464: 547(2001)
B-470: 541(2000), 520(2006)
B-471: 597(1990), 409(2000)
B-477: 470(2000)
B-494: 506(1992), 549(2000)
B-582: 477(1997)
B-800: 594(1990), 468(2000)
B-806: 440(2000), 487(2009)
B-808: 446(1991), 443(2000)
B-871: 596(1990), 554(1997)
¹01327: 466(1998)
¹01336: 468(2008)
¹01337: 472(2008)
¹01339: 470(2013)
¹01616: 466(1997)


Decommissioned

2001 – B-248 (3.05)
2002 – B-229 (10.04), B-404 (10.04), B-405 (10.04)
2005 – B-439 (3.12), B-470 (22.06)
2012 – B-401 (1.12)


Export

Algeria: 4+2 units (2 units of Project 06361 plan in 2018):
Rajs Hadi Mubarek 012 (till 15.09.1987 B-861), El Hadi Slimane 013 (till 12.1987 B-386), ¹01336 - 31.03.2010, Rajs Hadi Slimane 021 (till 27.07.2010 - ¹01337), hull number 022 (till 31.03.2010 ¹01336)

Vietnam: 2+4 units
Hanoi HQ-182 (till 7.11.2013 ¹01339), Ho Chi Minh HQ-183 (till äî 16.01.2014 ¹01340) plan 01.2014, Hai Phong HQ-184 (former ¹01341), Da Nang HQ-185 (former ¹01342), Khanh Hoa HQ-186 (former ¹01343), Ba Ria-Vung Tau HQ-187 (former ¹01344)

India: 10 units
Sindhughosh S55 (till 30.04.1986 B-888), Sindhudhvaj S56 (till 12.06.1987 B-898), Sindhuraj S57 (till 20.10.1987 B-890), Sindhuvir S58 (till 26.08.1988 B-860), Sindhuratna S59 (till 22.12.1988 B-803), Sindhukesari S60 (till 16.02.1989 B-804), Sindhukirti S61 (till 4.01.1990 B-468), Sindhuvijay S62 (till 8.03.1991 B-597), Sindhurakshak S63 (till 24.12.1997 B-582) 14.08.2013 sank after explosions caused by a fire took place onboard when the submarine was docked at Mumbai, Sindhushastra S64 (till 19.07.2000 çàâ.¹01618). Modernization under Project 08773 into the Zvezdochka, Severodvinsk - S55 in 30.08.2002-17.10.2005, S59 in 2002, S62 in 05.2005-05.2007, S63 in 3.08.2010-26.01.2013, Admiralteiskie Verfi, Sankt-Peterburg - S57 in 1999-2001, S60 in 1999-2001, «Hindustan Shipyards» - S61 in 11.2005. On S63 installed the Indian developed "USHUS" sonar

Iran: 3 units
Tareq 901 (till 21.11.1992 B-175), Noor 902 (till 6.06.1993 B-224), Yunes 903 (till 25.11.1996 B-220). Planning modernization on Project 08773

China: 12 units
¹364 (till 15.12.1994 B-185), ¹365 (till 5.09.1995 B-188), ¹366 (till 12.11.1997 ¹01616), ¹367 (till 2.12.1998 ¹01327), ¹368 (till 10.12.2004 ¹01329), ¹369 (till 5.05.2005 ¹01330), ¹370 (till 10.2005 ¹01331), ¹371 (till 10.2005 ¹01332), ¹372 (¹01333 30.05.2006), ¹373 (till 10.2005 B-340), ¹374 (till 22.12.2005 ¹701), ¹375 (till 12.2005 ¹702)

Poland: 1 unit
Orzel 291 (till 21.06.1986 B-351)

Romania: 1 unit
¹609, from 2.06.1991 Delfinul 521 (till 19.09.1986 B-801)

 
   

Main Page | FAQ | Feedback
© 2009-2014, Russian-Ships.info. All rights reserved.